In SAFe® (Scaled Agile Framework) practice, every event from PI Planning to Inspect & Adapt calls for a different tool. This page explains which Excel template to use, at which event, and why — and offers all five templates as free downloads in both Japanese and English.
The SAFe Flow & Where Each Template Fits
① WSJF Calculator
① WSJF
WSJF Calculator
Backlog Prioritization
- Fibonacci dropdowns with English descriptions
- Total CoD & WSJF Score auto-calculated
- Priority auto-ranked via RANK formula
- Color scale (red → green) visualization
- WSJF Guide sheet included (2-sheet workbook)
📌 Where it fits in the SAFe flow
1
PI Planning
Use WSJF to prioritize features objectively. Score each feature on User/Business Value, Time Criticality, and RR&OE using the Fibonacci dropdown, divide by Job Size, and let the score determine the order. Replaces subjective debate with data-driven consensus.
Use WSJF to prioritize features objectively. Score each feature on User/Business Value, Time Criticality, and RR&OE using the Fibonacci dropdown, divide by Job Size, and let the score determine the order. Replaces subjective debate with data-driven consensus.
2
Sprint Planning
Reference the WSJF scores to select which stories to pull into the sprint. Compare priority rank against team capacity to finalize the sprint commitment.
Reference the WSJF scores to select which stories to pull into the sprint. Compare priority rank against team capacity to finalize the sprint commitment.
3
PO Sync (Weekly)
When business conditions change mid-PI, recalculate WSJF scores for affected features and update priorities. Reflect changes in the next sprint plan.
When business conditions change mid-PI, recalculate WSJF scores for affected features and update priorities. Reflect changes in the next sprint plan.
② ROAM Risk Management
② ROAM
ROAM Risk Management
PI Planning Risk Classification & Tracking
- R/O/A/M dropdown → entire row auto-colors by category
- Probability × Impact → Priority auto-calculated (Critical / High / Medium / Low)
- SM Facilitation Checklist sheet (Steps 1–5 with ✔ completion tracking)
- ROAM Guide sheet included (3-sheet workbook)
📌 Where it fits in the SAFe flow
1
PI Planning Day 2
As teams call out risks during breakout sessions, classify each one live as R / O / A / M. Assign an owner and due date to every O and M item on the spot. The ROAM Risk Log doubles as the official meeting record.
As teams call out risks during breakout sessions, classify each one live as R / O / A / M. Assign an owner and due date to every O and M item on the spot. The ROAM Risk Log doubles as the official meeting record.
2
ART Sync (Weekly)
Follow up on O and M risk progress every week. Update resolved risks to R. If a risk stays unresolved for more than two weeks, escalate to the RTE and log the escalation in the memo column.
Follow up on O and M risk progress every week. Update resolved risks to R. If a risk stays unresolved for more than two weeks, escalate to the RTE and log the escalation in the memo column.
3
Inspect & Adapt
Review the PI’s risk management history and use unresolved risks as input for root-cause analysis in the Problem Solving Workshop.
Review the PI’s risk management history and use unresolved risks as input for root-cause analysis in the Problem Solving Workshop.
③ Program Board
③ Program Board
Program Board
Cross-Team Dependency Map
- 5 teams × Sprint 1–5 + IP Sprint grid
- Dependency status dropdown (🟢🔴🔒⭐⏸)
- 15-row dependency memo table with auto-color by status
- 3-sheet workbook: Blank template · Example · Guide
📌 Where it fits in the SAFe flow
1
PI Planning Day 2
Each team places committed features into their sprint columns and surfaces cross-team dependencies. Resolve what you can on the spot; mark the rest 🔴 (Unresolved). Every team seeing the same picture at the same time is the highest-value outcome of PI Planning.
Each team places committed features into their sprint columns and surfaces cross-team dependencies. Resolve what you can on the spot; mark the rest 🔴 (Unresolved). Every team seeing the same picture at the same time is the highest-value outcome of PI Planning.
2
ART Sync (Weekly)
Update dependency statuses every week — 🔴 → 🟢 as each one is resolved. If a dependency stays red for two or more weeks, escalate to the RTE and document the blocker reason in the memo table.
Update dependency statuses every week — 🔴 → 🟢 as each one is resolved. If a dependency stays red for two or more weeks, escalate to the RTE and document the blocker reason in the memo table.
3
IP Sprint
Summarize any remaining unresolved dependencies at PI end. The ideal state: all dependencies are 🟢 Resolved or formally Accepted with a documented mitigation plan before the next PI begins.
Summarize any remaining unresolved dependencies at PI end. The ideal state: all dependencies are 🟢 Resolved or formally Accepted with a documented mitigation plan before the next PI begins.
④ PO Sync Agenda & Minutes
④ PO Sync
PO Sync Agenda & Minutes
Weekly Backlog Alignment Meeting
- 4 sections: ① Progress · ② Priority · ③ Scope · ④ Actions
- BV Fibonacci dropdown with English descriptions
- Status-based row auto-coloring (green / yellow / red)
- Feature Tracker → Program Predictability auto-calculated
- PO Sync Guide sheet included (3-sheet workbook)
📌 Where it fits in the SAFe flow
1
PO Sync (Weekly)
Use this as the live meeting record every week: ① log feature progress and blockers → ② reassess priority changes using the BV Fibonacci dropdown → ③ decide scope additions or removals for the next sprint → ④ assign owners and due dates to every action item. Share with all attendees within 30 minutes.
Use this as the live meeting record every week: ① log feature progress and blockers → ② reassess priority changes using the BV Fibonacci dropdown → ③ decide scope additions or removals for the next sprint → ④ assign owners and due dates to every action item. Share with all attendees within 30 minutes.
2
After System Demo
Update the Actual AV in the Feature Tracker after each System Demo. Program Predictability (AV ÷ Planned BV × 100%) calculates automatically, giving a real-time read on PI delivery confidence.
Update the Actual AV in the Feature Tracker after each System Demo. Program Predictability (AV ÷ Planned BV × 100%) calculates automatically, giving a real-time read on PI delivery confidence.
3
Sprint Planning
Reference the previous PO Sync’s scope and priority decisions as direct inputs into sprint planning. Eliminates verbal hand-offs and ensures decisions reach the team intact.
Reference the previous PO Sync’s scope and priority decisions as direct inputs into sprint planning. Eliminates verbal hand-offs and ensures decisions reach the team intact.
⑤ SAFe Flow Metrics Dashboard
⑤ Flow Metrics
SAFe Flow Metrics Dashboard
6-Metric Management Dashboard
- Summary dashboard for all 6 metrics (status dropdown + improvement actions table)
- Individual sheets: ①Velocity ②Flow Time ③WIP ④Efficiency ⑤Distribution ⑥Predictability
- Auto-alert conditional formatting (red / yellow / green)
- Little’s Law explanation + “When to review” guide sheet (8-sheet workbook)
📌 Where it fits in the SAFe flow
1
Daily Scrum
Check the ③ Flow Load (WIP) sheet daily to confirm WIP stays within the agreed limit. Blocked items light up red immediately, enabling same-day action. Prevents the “everyone is busy but nothing gets done” trap.
Check the ③ Flow Load (WIP) sheet daily to confirm WIP stays within the agreed limit. Blocked items light up red immediately, enabling same-day action. Prevents the “everyone is busy but nothing gets done” trap.
2
ART Sync / PO Sync (Weekly)
At ART Sync, review ① Velocity · ② Flow Time · ③ WIP to spot cross-team bottlenecks. At PO Sync, review ⑥ Predictability to discuss BV achievement outlook and adjust plans if needed.
At ART Sync, review ① Velocity · ② Flow Time · ③ WIP to spot cross-team bottlenecks. At PO Sync, review ⑥ Predictability to discuss BV achievement outlook and adjust plans if needed.
3
Sprint Retrospective
Aggregate all 6 metrics at sprint level and review them with the team. Log improvement actions directly in the dashboard’s improvement actions table and verify their effect in the next sprint.
Aggregate all 6 metrics at sprint level and review them with the team. Log improvement actions directly in the dashboard’s improvement actions table and verify their effect in the next sprint.
4
IP Sprint
Use ⑤ Flow Distribution to check the technical debt ratio. Target: tech debt ≤20%, Features ≥60%. If debt exceeds the target, plan a dedicated reduction block in the IP Sprint.
Use ⑤ Flow Distribution to check the technical debt ratio. Target: tech debt ≤20%, Features ≥60%. If debt exceeds the target, plan a dedicated reduction block in the IP Sprint.
5
Inspect & Adapt
Present all 6 metrics as a PI-level summary comparing against the previous PI. Data-driven evidence raises the quality of Problem Solving Workshop discussions. Target: Program Predictability ≥ 80%.
Present all 6 metrics as a PI-level summary comparing against the previous PI. Data-driven evidence raises the quality of Problem Solving Workshop discussions. Target: Program Predictability ≥ 80%.
🎯 Key Takeaways: Embedding Excel Templates into the SAFe Flow
- At PI Planning, use the WSJF + ROAM + Program Board trio together — prioritize, classify risks, and map dependencies in one session while all teams are in the room.
- Every week at ART Sync and PO Sync, keep the Program Board and PO Sync Agenda updated. Consistent weekly cadence is what prevents direction drift across the PI.
- Flow Metrics is the most frequently used tool of the five — daily (WIP check), weekly (bottleneck identification), per sprint (retrospective), and per PI (I&A evidence). Think of it as the ART’s continuous health monitor.
- Using each template embedded in the SAFe flow — rather than as standalone spreadsheets — transforms gut-feel discussions into data-driven decisions, and improves both predictability and delivery speed PI over PI.
✅ All files are compatible with Microsoft Excel 2016+ and Google Sheets.