SAFe Tool



In SAFe® (Scaled Agile Framework) practice, every event from PI Planning to Inspect & Adapt calls for a different tool. This page explains which Excel template to use, at which event, and why — and offers all five templates as free downloads in both Japanese and English.

The SAFe Flow & Where Each Template Fits

📋
PI
Planning
Once per PI · 2 days

WSJF
ROAM
P.Board

📅
Sprint
Planning
Every 2 weeks

WSJF

☀️
Daily
Scrum
Daily

Flow③

🔁
ART Sync
PO Sync
Weekly

P.Board
PO Sync
Flow

🎬
System Demo
& Retro
Every sprint

PO Sync
Flow⑥

🔬
IP Sprint
& I&A
Once per PI

Flow All
ROAM

① WSJF Calculator
① WSJF
WSJF Calculator
Backlog Prioritization

  • Fibonacci dropdowns with English descriptions
  • Total CoD & WSJF Score auto-calculated
  • Priority auto-ranked via RANK formula
  • Color scale (red → green) visualization
  • WSJF Guide sheet included (2-sheet workbook)

📌 Where it fits in the SAFe flow
1
PI Planning
Use WSJF to prioritize features objectively. Score each feature on User/Business Value, Time Criticality, and RR&OE using the Fibonacci dropdown, divide by Job Size, and let the score determine the order. Replaces subjective debate with data-driven consensus.

2
Sprint Planning
Reference the WSJF scores to select which stories to pull into the sprint. Compare priority rank against team capacity to finalize the sprint commitment.

3
PO Sync (Weekly)
When business conditions change mid-PI, recalculate WSJF scores for affected features and update priorities. Reflect changes in the next sprint plan.

② ROAM Risk Management
② ROAM
ROAM Risk Management
PI Planning Risk Classification & Tracking

  • R/O/A/M dropdown → entire row auto-colors by category
  • Probability × Impact → Priority auto-calculated (Critical / High / Medium / Low)
  • SM Facilitation Checklist sheet (Steps 1–5 with ✔ completion tracking)
  • ROAM Guide sheet included (3-sheet workbook)

📌 Where it fits in the SAFe flow
1
PI Planning Day 2
As teams call out risks during breakout sessions, classify each one live as R / O / A / M. Assign an owner and due date to every O and M item on the spot. The ROAM Risk Log doubles as the official meeting record.

2
ART Sync (Weekly)
Follow up on O and M risk progress every week. Update resolved risks to R. If a risk stays unresolved for more than two weeks, escalate to the RTE and log the escalation in the memo column.

3
Inspect & Adapt
Review the PI’s risk management history and use unresolved risks as input for root-cause analysis in the Problem Solving Workshop.

③ Program Board
③ Program Board
Program Board
Cross-Team Dependency Map

  • 5 teams × Sprint 1–5 + IP Sprint grid
  • Dependency status dropdown (🟢🔴🔒⭐⏸)
  • 15-row dependency memo table with auto-color by status
  • 3-sheet workbook: Blank template · Example · Guide

📌 Where it fits in the SAFe flow
1
PI Planning Day 2
Each team places committed features into their sprint columns and surfaces cross-team dependencies. Resolve what you can on the spot; mark the rest 🔴 (Unresolved). Every team seeing the same picture at the same time is the highest-value outcome of PI Planning.

2
ART Sync (Weekly)
Update dependency statuses every week — 🔴 → 🟢 as each one is resolved. If a dependency stays red for two or more weeks, escalate to the RTE and document the blocker reason in the memo table.

3
IP Sprint
Summarize any remaining unresolved dependencies at PI end. The ideal state: all dependencies are 🟢 Resolved or formally Accepted with a documented mitigation plan before the next PI begins.

④ PO Sync Agenda & Minutes
④ PO Sync
PO Sync Agenda & Minutes
Weekly Backlog Alignment Meeting

  • 4 sections: ① Progress · ② Priority · ③ Scope · ④ Actions
  • BV Fibonacci dropdown with English descriptions
  • Status-based row auto-coloring (green / yellow / red)
  • Feature Tracker → Program Predictability auto-calculated
  • PO Sync Guide sheet included (3-sheet workbook)

📌 Where it fits in the SAFe flow
1
PO Sync (Weekly)
Use this as the live meeting record every week: ① log feature progress and blockers → ② reassess priority changes using the BV Fibonacci dropdown → ③ decide scope additions or removals for the next sprint → ④ assign owners and due dates to every action item. Share with all attendees within 30 minutes.

2
After System Demo
Update the Actual AV in the Feature Tracker after each System Demo. Program Predictability (AV ÷ Planned BV × 100%) calculates automatically, giving a real-time read on PI delivery confidence.

3
Sprint Planning
Reference the previous PO Sync’s scope and priority decisions as direct inputs into sprint planning. Eliminates verbal hand-offs and ensures decisions reach the team intact.

⑤ SAFe Flow Metrics Dashboard
⑤ Flow Metrics
SAFe Flow Metrics Dashboard
6-Metric Management Dashboard

  • Summary dashboard for all 6 metrics (status dropdown + improvement actions table)
  • Individual sheets: ①Velocity ②Flow Time ③WIP ④Efficiency ⑤Distribution ⑥Predictability
  • Auto-alert conditional formatting (red / yellow / green)
  • Little’s Law explanation + “When to review” guide sheet (8-sheet workbook)

📌 Where it fits in the SAFe flow
1
Daily Scrum
Check the ③ Flow Load (WIP) sheet daily to confirm WIP stays within the agreed limit. Blocked items light up red immediately, enabling same-day action. Prevents the “everyone is busy but nothing gets done” trap.

2
ART Sync / PO Sync (Weekly)
At ART Sync, review ① Velocity · ② Flow Time · ③ WIP to spot cross-team bottlenecks. At PO Sync, review ⑥ Predictability to discuss BV achievement outlook and adjust plans if needed.

3
Sprint Retrospective
Aggregate all 6 metrics at sprint level and review them with the team. Log improvement actions directly in the dashboard’s improvement actions table and verify their effect in the next sprint.

4
IP Sprint
Use ⑤ Flow Distribution to check the technical debt ratio. Target: tech debt ≤20%, Features ≥60%. If debt exceeds the target, plan a dedicated reduction block in the IP Sprint.

5
Inspect & Adapt
Present all 6 metrics as a PI-level summary comparing against the previous PI. Data-driven evidence raises the quality of Problem Solving Workshop discussions. Target: Program Predictability ≥ 80%.

🎯 Key Takeaways: Embedding Excel Templates into the SAFe Flow

  • At PI Planning, use the WSJF + ROAM + Program Board trio together — prioritize, classify risks, and map dependencies in one session while all teams are in the room.
  • Every week at ART Sync and PO Sync, keep the Program Board and PO Sync Agenda updated. Consistent weekly cadence is what prevents direction drift across the PI.
  • Flow Metrics is the most frequently used tool of the five — daily (WIP check), weekly (bottleneck identification), per sprint (retrospective), and per PI (I&A evidence). Think of it as the ART’s continuous health monitor.
  • Using each template embedded in the SAFe flow — rather than as standalone spreadsheets — transforms gut-feel discussions into data-driven decisions, and improves both predictability and delivery speed PI over PI.
✅ All files are compatible with Microsoft Excel 2016+ and Google Sheets.

Written by Norio Ikeda | Category: SAFe · Agile · PM Tools | Tags: SAFe, Excel Templates, Free Download, WSJF, ROAM, Program Board, PO Sync, SAFe Flow Metrics, Scrum Master, PI Planning